Target Audience: Metallurgical Engineers, Melting Supervisors, QA/QC Engineers
1. Charge Material is Everything: Pre-treatment & Management
Konsep Inti: “Garbage In, Garbage Out.” The primary function of an induction furnace is melting, not refining; therefore, source control is non-negotiable.
- Klasifikasi & Management:
- Chemical Segregation: Strictly separate Carbon Steel, Low-alloy Steel, Besi tahan karat, and Cast Iron returns. Trace amounts of Cr atau Cu mixing into plain carbon steel can cause mechanical property failures (MISALNYA., reduced elongation).
- Size Configuration: Place small material at the bottom to protect the lining, heavy blocks in the middle, and fill gaps with smaller scrap. Packing Density directly affects coupling efficiency and melt rate.
- Kebersihan:
- Karat & Sand Removal: Heavy rust ( Fe2O3 · H2O) introduces significant Oxygen and Hydrogen, leading to increased slag and porosity.
- Degreasing: Cutting fluids and oil on machine chips are sources of Carbon and Sulfur pickup, and are primary culprits for smoke and Hydrogen porosity.
- Pemanasan awal & Pengeringan:
- Keamanan: Eliminate moisture to prevent steam explosions.
- Efisiensi energi: Preheating to 300°C–500°C can significantly reduce electrical consumption.
2. Effective Deslagging: Metal Purity & Lining Protection
Konsep Inti: Slag is a “protective coat” for the melt but a “trash can” for inclusions. Improper handling makes it a “killer” of furnace linings.
- Selection of Slag Coagulants:
- Use Perlite or specialized slag removers. High-quality coagulants should expand and bind immediately upon contact, forming a crust that is easy to skim.
- Warning: Avoid fluxes with high Sodium (Na) content. While they fluidize the slag, they aggressively attack Acidic (Silika) linings.
- Timing of Deslagging:
- Post-Melt Down: Skim to remove the bulk of the dirty material once fully melted.
- Pre-Tap: Must skim before adding expensive ferroalloys to prevent them from being trapped in the slag and oxidized.
- “Slag Cover” Strategi: In specific processes, maintaining a very thin layer of slag can prevent the molten steel from aspirating gases (N, H), though this requires skilled operators.
- Lining Protection:
- Avoid mechanical impact on the furnace walls during manual skimming.
- Control Slag Basicity to prevent “Chemical Erosion.” Acidic linings suffer from basic slag (tinggi CaO); Basic linings suffer from acidic slag (tinggi SiO2).
3. Kontrol Suhu Yang Tepat: The Dual Risks
Konsep Inti: Temperature is the lifeline. Unlike an Electric Arc Furnace (EAF), an Induction Furnace has limited refining capabilities; overheating usually causes more harm than good.
- Measurement Methods:
- Disposable Dip Thermocouple: The Gold Standard. Ensure the tip penetrates the slag layer and reaches the center of the melt (typically ~300mm below the surface).
- Infrared/Optical Pyrometers: Use only for trending. They are easily affected by fumes, slag cover, and emissivity changes, leading to data drift.
- Consequences of Improper Control:
- Terlalu panas:
- Gas Pickup: Solubility of H2 Dan N2 increases exponentially with every 100°C rise.
- Erosi Lapisan:SiO2 + 2C → Dan + 2BERSAMA (Crucible reduction by Carbon at high temps).
- Coarse Grains: Leads to reduced impact toughness in the final casting.
- Under-heating:
- Inclusion Retention: stokes’ Law dictates that inclusions float slower in cooler, more viscous metal.
- Misruns/Cold Shuts: Poor mold filling capability.
- Terlalu panas:
4. Reaksi metalurgi: Deoksidasi & Paduan
Konsep Inti: Even in “dead melting,” chemical reactions occur. Electromagnetic stirring is a double-edged sword.
- Deoxidation Regimes:
- Precipitation Deoxidation: Must be done before tapping. Typical sequence: Weak to Strong (Mn → Si → Al).
- Deoksidasi Akhir: Stream inoculation or addition of final deoxidizers (MISALNYA., Ca-Si, Rare Earths) during tapping to modify inclusion morphology.
- Alloying Strategy:
- Addition Sequence:
- Refractory elements (MISALNYA., Mo, Cr) should be added early.
- Oxidizable elements (MISALNYA., Dari, Al, B) should be added late, after good pre-deoxidation.
- Carbon Adjustment: Recarburizers (Grafit) should be added with the solid charge. Late additions have very poor recovery (<60%).
- Addition Sequence:
- Kontrol Elemen:
- Silicon Pickup: Pada suhu tinggi, Carbon reduces the Silica lining, potentially causing unintended spikes in Dan content during long holds.
- Mn/S Ratio: Maintain Mn/S > 10 to prevent hot tearing/shortness.
5. Pemecahan masalah: Reverse Engineering from Defects
Konsep Inti: The casting is the “Black Box” that records melting quality.
| Defect Type | Root Cause (Induction Furnace Operation) | Corrective Action |
| Gas Porosity | Wet/Oily charge; Tapping temp too high; Wet ladles/spouts; Insufficient Deoxidation. | Preheat charge; Limit max temp; Bake ladles thoroughly; Boost Al deoxidation. |
| Inklusi Terak | Poor skimming; Slag entrainment during tap; Severe lining erosion; Insufficient settling time. | Use effective coagulants; Use teapot ladles or slag dams; Repair lining; Allow 2-5 min settling after tap. |
| Off-Chemistry | Weighing errors; Wrong recovery estimates; Mixed scrap; Poor sampling representation. | Calibrate scales; Build recovery database per grade; Standardize spectral sampling. |
| Retak | High S, P content; Trace element buildup from excessive returns. | Control scrap source; Limit ratio of returns (khas <40%). |