ইন্ডাকশন ফার্নেস গলানোর প্রক্রিয়া এবং গুণমান নিয়ন্ত্রণ

Target Audience: Metallurgical Engineers, Melting Supervisors, QA/QC Engineers

1. Charge Material is Everything: Pre-treatment & Management

মূল ধারণা:Garbage In, Garbage Out.The primary function of an induction furnace is melting, not refining; therefore, source control is non-negotiable.

  • শ্রেণীবিভাগ & Management:
    • Chemical Segregation: Strictly separate Carbon Steel, Low-alloy Steel, মরিচা রোধক স্পাত, and Cast Iron returns. Trace amounts of সিআর বা কিউ mixing into plain carbon steel can cause mechanical property failures (যেমন, reduced elongation).
    • Size Configuration: Place small material at the bottom to protect the lining, heavy blocks in the middle, and fill gaps with smaller scrap. Packing Density directly affects coupling efficiency and melt rate.
  • পরিচ্ছন্নতা:
    • মরিচা & Sand Removal: Heavy rust ( Fe2O3 · H2O) introduces significant Oxygen and Hydrogen, leading to increased slag and porosity.
    • Degreasing: Cutting fluids and oil on machine chips are sources of Carbon and Sulfur pickup, and are primary culprits for smoke and Hydrogen porosity.
  • প্রিহিটিং & শুকানো:
    • নিরাপত্তা: Eliminate moisture to prevent steam explosions.
    • শক্তির দক্ষতা: Preheating to 300°C–500°C can significantly reduce electrical consumption.

2. Effective Deslagging: Metal Purity & Lining Protection

মূল ধারণা: Slag is aprotective coatfor the melt but atrash canfor inclusions. Improper handling makes it akillerof furnace linings.

  • Selection of Slag Coagulants:
    • Use Perlite or specialized slag removers. High-quality coagulants should expand and bind immediately upon contact, forming a crust that is easy to skim.
    • সতর্কতা: Avoid fluxes with high Sodium (Na) content. While they fluidize the slag, they aggressively attack Acidic (সিলিকা) linings.
  • Timing of Deslagging:
    • Post-Melt Down: Skim to remove the bulk of the dirty material once fully melted.
    • Pre-Tap: Must skim before adding expensive ferroalloys to prevent them from being trapped in the slag and oxidized.
    • Slag CoverStrategy: In specific processes, maintaining a very thin layer of slag can prevent the molten steel from aspirating gases (এন, এইচ), though this requires skilled operators.
  • Lining Protection:
    • Avoid mechanical impact on the furnace walls during manual skimming.
    • Control Slag Basicity to preventChemical Erosion.Acidic linings suffer from basic slag (উচ্চ CaO); Basic linings suffer from acidic slag (উচ্চ সিও 2).

3. সুনির্দিষ্ট তাপমাত্রা নিয়ন্ত্রণ: The Dual Risks

মূল ধারণা: Temperature is the lifeline. Unlike an Electric Arc Furnace (ইএএফ), an Induction Furnace has limited refining capabilities; overheating usually causes more harm than good.

  • Measurement Methods:
    • Disposable Dip Thermocouple: The Gold Standard. Ensure the tip penetrates the slag layer and reaches the center of the melt (typically ~300mm below the surface).
    • Infrared/Optical Pyrometers: Use only for trending. They are easily affected by fumes, slag cover, and emissivity changes, leading to data drift.
  • Consequences of Improper Control:
    • অতিরিক্ত উত্তাপ:
      • Gas Pickup: Solubility of H2 এবং N2 increases exponentially with every 100°C rise.
      • আস্তরণের ক্ষয়:সিও 2 + 2গএবং + 2কো (Crucible reduction by Carbon at high temps).
      • Coarse Grains: Leads to reduced impact toughness in the final casting.
    • Under-heating:
      • Inclusion Retention: StokesLaw dictates that inclusions float slower in cooler, more viscous metal.
      • Misruns/Cold Shuts: Poor mold filling capability.

4. ধাতব প্রতিক্রিয়া: ডিওক্সিডেশন & অ্যালোইং

মূল ধারণা: Even indead melting,” chemical reactions occur. Electromagnetic stirring is a double-edged sword.

  • Deoxidation Regimes:
    • Precipitation Deoxidation: Must be done before tapping. Typical sequence: Weak to Strong (Mn → Si → Al).
    • চূড়ান্ত ডিওক্সিডেশন: Stream inoculation or addition of final deoxidizers (যেমন, Ca-Si, Rare Earths) during tapping to modify inclusion morphology.
  • Alloying Strategy:
    • Addition Sequence:
      • Refractory elements (যেমন, মো, সিআর) should be added early.
      • Oxidizable elements (যেমন, এর, আল, ) should be added late, after good pre-deoxidation.
      • Carbon Adjustment: Recarburizers (গ্রাফাইট) should be added with the solid charge. Late additions have very poor recovery (<60%).
  • উপাদান নিয়ন্ত্রণ:
    • Silicon Pickup: উচ্চ তাপমাত্রায়, Carbon reduces the Silica lining, potentially causing unintended spikes in এবং content during long holds.
    • Mn/S Ratio: Maintain Mn/S > 10 to prevent hot tearing/shortness.

5. Troubleshooting: Reverse Engineering from Defects

মূল ধারণা: The casting is the “ব্ল্যাক বক্স” that records melting quality.

Defect TypeRoot Cause (Induction Furnace Operation)Corrective Action
Gas PorosityWet/Oily charge; Tapping temp too high; Wet ladles/spouts; Insufficient Deoxidation.Preheat charge; Limit max temp; Bake ladles thoroughly; Boost Al deoxidation.
স্ল্যাগ অন্তর্ভুক্তিPoor skimming; Slag entrainment during tap; Severe lining erosion; Insufficient settling time.Use effective coagulants; Use teapot ladles or slag dams; Repair lining; Allow 2-5 min settling after tap.
Off-ChemistryWeighing errors; Wrong recovery estimates; Mixed scrap; Poor sampling representation.Calibrate scales; Build recovery database per grade; Standardize spectral sampling.
CracksHigh S, P content; Trace element buildup from excessive returns.Control scrap source; Limit ratio of returns (সাধারণত <40%).